Zed cpp cpm engine critical_path_validator
How to: Zed cpp cpm engine critical_path_validator
Add cpp cpm engine to Zed
-
01
Open ~/.config/zed/settings.json and merge this in. Keep any servers already there.
{
"context_servers": {
"cpp-cpm-engine": {
"url": "https://mcp.criticalpathpartners.ca/mcp"
}
}
}
-
02
Save the file and restart Zed.
-
03
Ask for something critical_path_validator does. Zed lists the server's tools on connect and calls critical_path_validator itself — you do not invoke it by name.
-
04
If nothing happens, check the server is running and that cpp cpm engine's identifier in your config matches the one above exactly.
Merge this into your existing settings object — do not replace the file. Zed docs
Same tool, other clients
This list was read from the server itself, by connecting to it and calling tools/list on 24 September 2026. It is what
the server actually exposes, not what its listing claims.
Mutating and Read-only are read off each tool's name, not its schema — a hint, not a guarantee. The registry stores tool names only; connect the server for its live schemas.